Posted: Sun Feb 28, 10 8:33 pm
Engine has new cam bearings
gearbox is rebuilt
Engine is being picked up tomorrow by kiwi [god bless him],from the sounds off things the weekend will see us measuring for the pushrods,which means im assuming the majority of the engine will be built
hoping the next 4-5 weeks will see us starting up the car
extra jobs are both off side and near side outer front wings and a new rad support section,i will post pictures later but i have just poked a hole about 3 inch tall by 3 inch wide in the pass wing
wont have much time after that as my company has just told me they are loading an extra 25 jobs a week on us [about an extra 3/4 of the work again] but minimum they are doubling my wages
not going to knock that,but it does mean i am not going to have much time for cars,but will be down shakey as often as i can getting the car running as good and fast as possible 
gearbox is rebuilt
Engine is being picked up tomorrow by kiwi [god bless him],from the sounds off things the weekend will see us measuring for the pushrods,which means im assuming the majority of the engine will be built
hoping the next 4-5 weeks will see us starting up the car
extra jobs are both off side and near side outer front wings and a new rad support section,i will post pictures later but i have just poked a hole about 3 inch tall by 3 inch wide in the pass wing
wont have much time after that as my company has just told me they are loading an extra 25 jobs a week on us [about an extra 3/4 of the work again] but minimum they are doubling my wages