
Got the Pit up on ramps , so not a lot of room under there. Dragged the new box under , goes to fit the vertor , would'nt go in , dragged the box back out , tried again (hour), so we decided to try to fit the other two vertors to the box, no go , another hour.
Fitted all three vertors to the old box , so it was decided there was a problem with the spline on the new box.
Gary decided to remove the front pump off the old box & fit it to the new box , at this time i decided to make a cuppa & have a fag.
Tried the front pump spline in the vertor (new one) , wouldn't have it, obviously something wrong with spline , but nothing visable.
Once the old front pump was fitted to the new box , the vertor fell in

All in all a good day , finished around 10 o'clock.
Deffinately gonna buy a chevy.
Had it up to hear with that no good pile of poo, even the simplest of jobs are a main event, can't remember a time when anything fell into place , tell a lie , it was draining the box , only cos I fitted a drain plug.

You gotta have the patience of a saint to own or work on these possesed animals.
Thanks Gary
