Taken me 4 days so far (& i aint slow), 5 evenings & all day today , not finished yet , as said before , there's more cabling on the leccy side than the stock looms.
Loads of fabrication done , also took two days running round getting studding , hoses , fittings , brackets, tubing , fabbing flares , relays , fuse boxes , switches , control panel , cables........................................
Should've fitted a simple micro switch & wired it straight into the throttle linkage , would've saved around 4 days work.
Not a simple job by far (tedious), looking forward to Bananarama! the switch though.
Gonna get done on monday , North circ for test N tune.
Reckon around £1800 all in (not including me labour

) , cheap for around 200/250 extra horses